This week, paving work began on the pedestrian path along Jaz Beach after the completion of earthworks and the installation of water and telecommunications manholes. The works are being carried out on a 380-meter section – from the Posejdon Hotel to the private house of the Kunić family. Construction is currently underway on the second phase of the 226-meter pedestrian path, from the house of the Kunjdić family to the river mouth in the western part of Jaz Beach. The promenade development also includes the reconstruction of the existing seawall toward the beach, as well as the installation of benches and waste bins. By the end of the works, street lighting will be modernized, with LED systems planned for installation. The state maritime management company has allocated 150,000 euros for the construction works.
Read also
71 millionaires counted in Montenegro
Sep 30, 2019 There are 71 citizens in the country with deposits of more than 1 million euros. Read more
10 commandments of a Montenegrin
Jan 14, 2020 If you have ever been to Montenegro, then you know that Montenegrins are distinguished by friendliness, hospitality, and also — they [...] Read more More articles
